PoC 13 Intent-based RAN resource management: Difference between revisions
From ZSM Wiki
(Created page with "== PoC Team == * DOCOMO Communications Lab. * NTT Comware Corp. * NTT Communications Corp. * NTT DOCOMO INC. == Main Contact == * Choonming Chen (choonming.chen.nu''_at_''nttdocomo.com) == Abstract == This PoC demonstrates the use case of the Intent-based RAN resource management. The scope of this PoC is to verify how the RAN MD checks the feasibility of RAN intent delivered from E2E MD based on RAN resource usage and reservation status, and sends the result of the inte...") |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 21: | Line 21: | ||
== PoC Demo == | == PoC Demo == | ||
* Demo 1, Apr 2025 (ZSM#30 meeting), Demonstrate feasibility check of RAN intent and notification about the result of the intent feasibility check and recommendation. | * [https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2025/ZSM(25)000042r1_ZSM_PoC_13_Intent-based_RAN_resource_management_Demo_Video.zip Demo 1], Apr 2025 (ZSM#30 meeting), Demonstrate feasibility check of RAN intent and notification about the result of the intent feasibility check and recommendation. | ||
== PoC Report(s) == | == PoC Report(s) == | ||
* PoC #13 Final report | * PoC #13 Final report was presented at the ZSM#30 meeting (23 April 2025) - [http://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2025/ZSM(25)000043_ZSM_PoC_13_Final_Report.docx ZSM(25)000043] on ETSI portal - [[media:ZSM(25)000043_ZSM_PoC_13_Final_Report.pdf |Download pdf]] | ||
'''PoC Successfully Completed''' |
Latest revision as of 16:04, 14 May 2025
PoC Team
- DOCOMO Communications Lab.
- NTT Comware Corp.
- NTT Communications Corp.
- NTT DOCOMO INC.
Main Contact
- Choonming Chen (choonming.chen.nu_at_nttdocomo.com)
Abstract
This PoC demonstrates the use case of the Intent-based RAN resource management. The scope of this PoC is to verify how the RAN MD checks the feasibility of RAN intent delivered from E2E MD based on RAN resource usage and reservation status, and sends the result of the intent feasibility check and recommendation to E2E MD.
The implementation of the solution of this PoC use the 3GPP standards and ZSM standards as a reference. The design architecture of the use case follows ZSM 002 (ZSM framework) and uses the intent-driven management service (including intent management operations and intent information model) defined in 3GPP TS 28.312.
PoC Proposal
Full PoC proposal on ETSI portal as ZSM(24)000198r1
PoC Topics
This PoC is WORKING on:
- Topic 3 - Intent-driven Closed-Loop automation
PoC Demo
- Demo 1, Apr 2025 (ZSM#30 meeting), Demonstrate feasibility check of RAN intent and notification about the result of the intent feasibility check and recommendation.
PoC Report(s)
- PoC #13 Final report was presented at the ZSM#30 meeting (23 April 2025) - ZSM(25)000043 on ETSI portal - Download pdf
PoC Successfully Completed