PoC 5 On-demand Non-Public Networks (NPNs) for industry 4.0: zero-touch provisioning practices in public-private network environments.: Difference between revisions
(3 intermediate revisions by the same user not shown) | |||
Line 43: | Line 43: | ||
* Contribution on lessons learned, June 2022, Feedback on lessons learnt about the PoC, in order to make improvements when executing the PoC in production factory networks (see clarifications on portable testbed vs in-factory setup in Section 2.2). | * Contribution on lessons learned, June 2022, Feedback on lessons learnt about the PoC, in order to make improvements when executing the PoC in production factory networks (see clarifications on portable testbed vs in-factory setup in Section 2.2). | ||
* Feedback to ISG ZSM on potential improvements, June 2022, This PoC relates to ZSM 002, ZSM 003 and ZSM 008. Potential improvements of these standards, if any, might be discovered by the PoC, and will be input to contributions to work items. | * Feedback to ISG ZSM on potential improvements, June 2022, This PoC relates to ZSM 002, ZSM 003 and ZSM 008. Potential improvements of these standards, if any, might be discovered by the PoC, and will be input to contributions to work items. | ||
* PoC | * PoC #5 Final report (July 2022) - [http://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2022/ZSM(22)000349r1_ZSM_PoC_5_Final_Report.docx ZSM(22)000349r1] on ETSI portal - [[media:ZSM(22)000349r1_ZSM_PoC_5_Final_Report.pdf |Download pdf]] | ||
'''PoC Successfully Completed''' |
Latest revision as of 15:57, 9 May 2023
PoC Team
- Telefónica
- Fundaciò i2CAT
- NextWorks
- Interdigital
- Universidad Carlos III de Madrid
Main Contact
- Jose Ordonez-Lucena (joseantonio.ordonezlucena_at_telefonica.com)
- Diego R. López (diego.r.lopez_at_telefonica.com)
Abstract
After interviews with real-world industry 4.0 verticals, participants have identified the as-is situation: nowadays, autonomous Guide Vehicles (AGV) navigate autonomously in a factory, and the vertical does not know how often it does stop, and why. The objective is to PoC is to precisely allow the vertical to gain this knowledge (business intelligence), and then use it to optimize AGV trajectories (e.g., replan trajectory). This PoC is conceived to demonstrate the use of ZSM services and associated zero-touch management capabilities to provision a private 5G network on-demand. This private 5G network will be used to enhance autonomous navigation of AGV in the shop floor of a factory, allowing a remote worker to keep track of AGV trajectory and alert him/her on unexpected incidents (also known as disturbances) that cause deviations from the planned route. When the unexpected incident happens, the AGV slows down or stops, captures a photo on what is in front of it with the on-board camera, and sends the photo to a pre-trained obstacle detection function. This application identifies that the root cause of the incident is an obstacle, and notifies the remote worker accordingly, with the coordinates where the obstacle is, together with the photo taken. The private 5G network will not be confined to on-premises infrastructure; in fact, it will rely on the capabilities of telco edge computing to host obstacle detection function. The result is a PNI-NPN. To make an agile yet efficient provisioning of the PNI-NPN, network slicing will be used.
PoC Proposal
Full PoC proposal on etsi portal as ZSM(22)000125r1 - Download pdf
PoC Topics
This PoC is WORKING on:
- Topic 2 - Automation in Multi-Stakeholder Ecosystems
- Topic 4 - Cross-domain user-driven E2E services
PoC Demo
- Demo 1, June 2022, Showcasing PoC results at 2022 EuCNC & 6G Summit (EuCNC’22). 7-10 June 2022, Grenoble (France).
- Demo 2, ZSM#20, 10-13 October 2022, Dublin (Ireland)
Other links
[3] 3GPP TS 23.501, “System architecture for the 5G System (5GS)”.
[4] https://i2cat.net/project-cat/industry-4-0/
[6] Vidal, I.; Nogales, B.; Lopez, D.; Rodríguez, J.; Valera, F.; Azcorra, A. “A Secure Link-Layer Connectivity Platform for Multi-Site NFV Services”. Electronics 2021, 10, 1868. DOI: https://doi.org/10.3390/electronics10151868
[7] Open5GS
PoC Reports
- Contribution on lessons learned, June 2022, Feedback on lessons learnt about the PoC, in order to make improvements when executing the PoC in production factory networks (see clarifications on portable testbed vs in-factory setup in Section 2.2).
- Feedback to ISG ZSM on potential improvements, June 2022, This PoC relates to ZSM 002, ZSM 003 and ZSM 008. Potential improvements of these standards, if any, might be discovered by the PoC, and will be input to contributions to work items.
- PoC #5 Final report (July 2022) - ZSM(22)000349r1 on ETSI portal - Download pdf
PoC Successfully Completed