PoC 9 Intent-driven Energy Saving.: Difference between revisions
No edit summary |
No edit summary |
||
Line 27: | Line 27: | ||
== PoC Demo == | == PoC Demo == | ||
* Demo 1, Mar 2024 (ZSM#26 meeting), Demonstrate standardized intent-driven interface. | * Demo 1, Mar 2024 (ZSM#26 meeting), Demonstrate standardized intent-driven interface. | ||
[https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2024/ZSM(24)000044r1_ZSM_PoC_9_Intent-driven_Energy_Saving_demo_1.pptx] | [https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2024/ZSM(24)000044r1_ZSM_PoC_9_Intent-driven_Energy_Saving_demo_1.pptx Demo 1] | ||
* Demo 1, May 2024 (ZSM#27 meeting), Demonstrate intent handling, and RAN energy saving action execution, with intent report returned for energy saving effect evaluation and monitor. | * Demo 1, May 2024 (ZSM#27 meeting), Demonstrate intent handling, and RAN energy saving action execution, with intent report returned for energy saving effect evaluation and monitor. | ||
[https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2024/ZSM(24)000109r1__ZSM_PoC_9_Intent-Driven_Energy-Saving_demo_2.pptx] | [https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2024/ZSM(24)000109r1__ZSM_PoC_9_Intent-Driven_Energy-Saving_demo_2.pptx Demo 2] | ||
== PoC Report(s) == | == PoC Report(s) == | ||
* PoC #9 Final report expected in June 2024 | * PoC #9 Final report expected in June 2024 |
Revision as of 15:14, 12 November 2024
PoC Team
- Huawei Technologies
- China Telecom
- Deutsche Telekom
- Xidian University
Main Contact
- Miss yuan XIE (yuan.xie_at_huawei.com)
Abstract
This PoC Project describes the use of an intent-driven approach for Energy Saving in the radio network domain. The PoC aims to demonstrate:
1) How an intent-driven approach used by a NOP (as MnS consumer/intent owner) to express the RAN energy saving expectation (including energy efficiency targets and user experience targets) to a NEP (as MnS producer/intent handler/intent management entity).
2) How the NOP monitors the RAN energy saving effects, by obtaining a detailed intent report (e.g. regarding energy consumption) from NEP.
(Note: NOP - Network Operator; NEP - Network Equipment Provider) The implementation of the solution of this PoC complies with the 3GPP and the ZSM specifications. The design architecture of the use case follows ZSM 002 (ZSM framework), and uses the intent-driven management service (including intent management operations and intent information model) defined in 3GPP TS 28.312.
PoC Proposal
Full PoC proposal on ETSI portal as ZSM(23)000229r2 - Download pdf
PoC Topics
This PoC is WORKING on:
- Topic 3 - Intent-driven Closed-Loop automation
PoC Demo
- Demo 1, Mar 2024 (ZSM#26 meeting), Demonstrate standardized intent-driven interface.
- Demo 1, May 2024 (ZSM#27 meeting), Demonstrate intent handling, and RAN energy saving action execution, with intent report returned for energy saving effect evaluation and monitor.
PoC Report(s)
- PoC #9 Final report expected in June 2024