PoC 21 Agent-based Fault Management on Slicing Packet Networking

From ZSM Wiki
Revision as of 10:32, 18 June 2026 by Burckarda (talk | contribs) (Created page with "== PoC Team == * Huawei * China Mobile * China Academy of Information and Communications Technology (CAICT) == Main Contact == * Xie Yuan (yuan.xie''_at_''huawei.com) * Fei Guo (Guofei''_at_''huawei.com) == Contributors == * Chen Xin (chenxin''_at_''gd.chinamobile.com) * Zhang Xiaofeng (zhangxiaofeng''_at_''gd.chinamobile.com) * Liu Xudong (liuxudong2''_at_''gd.chinamobile.com) * Ma Junfeng (majunfeng''_at_''caict.ac.cn) * Liu Zhiruo (liuzhiruo''_at_''caict.ac.cn) == A...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

PoC Team

  • Huawei
  • China Mobile
  • China Academy of Information and Communications Technology (CAICT)

Main Contact

  • Xie Yuan (yuan.xie_at_huawei.com)
  • Fei Guo (Guofei_at_huawei.com)

Contributors

  • Chen Xin (chenxin_at_gd.chinamobile.com)
  • Zhang Xiaofeng (zhangxiaofeng_at_gd.chinamobile.com)
  • Liu Xudong (liuxudong2_at_gd.chinamobile.com)
  • Ma Junfeng (majunfeng_at_caict.ac.cn)
  • Liu Zhiruo (liuzhiruo_at_caict.ac.cn)

Abstract

This PoC Project will demonstrate the fault management including fault detection, analysis, resolution through multi-agent collaboration, the whole process of fault management not only within single-domain but also cross-domain. The PoC aims to demonstrate: 1) How agents collaborate within the ZSM framework, which supports agent capability registration and discovery, task assignment and collaboration. 2) Summarizing a human-readable fault resolution report, including the root cause, repair recommendations, and resolution status. 3) Trustworthiness focus - Visualization of the whole process including collaboration of multiple agents.

The implementation of the solution of this PoC complies with the ZSM standards. The design architecture of the use case follows GS ZSM 002 (ZSM Framework), and uses the multi-agent systems in GS ZSM 022.

PoC Proposal

Full PoC proposal on ETSI portal as ZSM(26)000114r1 - Download pdf

PoC Topics

This PoC is WORKING on:

PoC Demo

  • Demo, Sep 2026, Demonstrate how the E2E SMD agent and MD agents collaborate within the ZSM framework, to solve issues and potential risks on SPN.

PoC Report(s)

  • PoC #21 Final report expected in Dec 2026