PoC 2 Automated Network Slice Scaling in Multi-Site Environments: Difference between revisions
No edit summary |
|||
Line 17: | Line 17: | ||
== PoC Proposal == | == PoC Proposal == | ||
The full PoC proposal is available in: | The full PoC proposal is available in the ETSI ZSM Portal: | ||
[https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2020/ZSM(20)000507_ZSM_PoC_Proposal_Automated_Network_Slice_Scaling_in_Multi-Si.docx ISG ZSM PoC proposal "Automated Network Slice Scaling in Multi-Site Environments"] | [https://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2020/ZSM(20)000507_ZSM_PoC_Proposal_Automated_Network_Slice_Scaling_in_Multi-Si.docx ISG ZSM PoC proposal "Automated Network Slice Scaling in Multi-Site Environments"] - [[media:ZSM POC 2.pdf|Download pdf]] | ||
[[media:ZSM POC 2.pdf|Download pdf]] | |||
== PoC Topics == | == PoC Topics == |
Revision as of 10:38, 19 January 2021
PoC Team
- Telefónica S.A.
- Telenor ASA
- Universidad Carlos III (UC3M)
- University of Patras (UoP)
- Openslice
Main Contact
Jose Ordonez-Lucena, Telefonica (joseantonio.ordonezlucena _at_ telefonica.com)
PoC Demo
March 2021, venue & logistics TBD
Abstract
This PoC has the aim at demonstrating the capacity to automatically scale out a deployed network instance across multiple administrative domains. This will be achieved using the 5G assets of 5G-VINNI, which is a large-scale, end-to-end facility composed of several interworking sites, each deployed at a different geographic location and defining a single administrative domain. The management and orchestration capabilities of individual sites, and the enablers allowing for the interworking across them, are aligned with ZSM architectural design principles. The PoC fits the end-to-end (E2E) service management scenario category detailed in ZSM 001, considering the slicing features specified in ZSM 003.
PoC Proposal
The full PoC proposal is available in the ETSI ZSM Portal: ISG ZSM PoC proposal "Automated Network Slice Scaling in Multi-Site Environments" - Download pdf
PoC Topics
This PoC is WORKING on:
Topic2 - Automation in Multi-Stakeholder Ecosystems
PoC Contributions to Topic2 are expected by March 2021
PoC Report
PoC Report is expected by April 2021