PoC 3 Automation of Intent-based cloud leased line service: Difference between revisions
From ZSM Wiki
m (→Main Contact) |
|||
Line 21: | Line 21: | ||
== PoC Topics == | == PoC Topics == | ||
This PoC is WORKING on: | This PoC is WORKING on: | ||
* Topic 3 - [[Topic 3 - Intent-driven Closed-Loop automation|Intent-driven Closed-Loop automation]] | |||
* Topic 4 - [[Topic 4 - Cross-domain user-driven E2E services|Cross-domain user-driven E2E services]] | |||
== PoC Demo == | == PoC Demo == | ||
* Demo 1, expected May 2022, "Automated CPL service creation and modification using ZSM framework (ZSM 002) (simulated hardware)" | |||
* Demo 2, expected May 2022, "Closed-loop in Transport MD (ZSM 009) (simulated hardware). Demo 2 will be built as an evolution of Demo 1." | |||
* Demo 3, expected Nov 2022 "Demo with real hardware and real data traffic" | |||
== Other links == | == Other links == | ||
== PoC Reports == | == PoC Reports == |
Revision as of 15:58, 3 March 2022
PoC Team
- China Telecom
- China Mobile
- China Unicom
- Huawei Technologies
- AsiaInfo Technologies
- Xidian University
Main Contact
- Wang Dong, China Telecommunications (wangd5_at_ chinatelecom.cn)
- Henry Yu, Huawei (henry.yu1_at_huawei.com=
Abstract
This PoC demonstrates the automation of the Intent-based cloud leased line (CLL) use-case. The use-case is developed on ONAP, and its implementation complies with the ZSM standards. The PoC will demonstrate management services (defined in ZSM 002), cross-domain orchestration (ZSM 008), closed-loop (ZSM 009), and Intent-based networking (ZSM 011).
PoC Proposal
The full PoC proposal is available in the ETSI ZSM Portal: ISG ZSM PoC proposal "Intent-based Cloud Leased Line on ONAP" - Download pdf
PoC Topics
This PoC is WORKING on:
- Topic 3 - Intent-driven Closed-Loop automation
- Topic 4 - Cross-domain user-driven E2E services
PoC Demo
- Demo 1, expected May 2022, "Automated CPL service creation and modification using ZSM framework (ZSM 002) (simulated hardware)"
- Demo 2, expected May 2022, "Closed-loop in Transport MD (ZSM 009) (simulated hardware). Demo 2 will be built as an evolution of Demo 1."
- Demo 3, expected Nov 2022 "Demo with real hardware and real data traffic"