User contributions for Burckarda
14 May 2025
- 16:0616:06, 14 May 2025 diff hist 0 N File:ZSM(25)000043 ZSM PoC 13 Final Report.pdf No edit summary current
- 16:0416:04, 14 May 2025 diff hist −2 PoC 13 Intent-based RAN resource management No edit summary current
- 10:5510:55, 14 May 2025 diff hist +28 Ongoing PoCs No edit summary current
- 10:5010:50, 14 May 2025 diff hist +396 PoC 13 Intent-based RAN resource management No edit summary
29 April 2025
- 08:3408:34, 29 April 2025 diff hist +1,065 N PoC 14 Intent-based trust management and orchestration in network services Created page with "== PoC Team == * Telefonica * Universidad Complutense de Madrid * National Centre For Scientific Research Demokritos * Space Hellas * Ubitech == Main Contact == * Antonio Pastor (antonio.pastorperales''_at_''telefonica.com) == Abstract == This PoC introduces a framework that leverages intent-based networking (IBN) principles to enhance trust in next-generation network services. The proposed solution focuses on provisioning service slices with a guaranteed minimum Level..." current Tag: Visual edit: Switched
- 08:2408:24, 29 April 2025 diff hist +388 Ongoing PoCs No edit summary
23 April 2025
- 10:3910:39, 23 April 2025 diff hist −2 PoC 9 Intent-driven Energy Saving. No edit summary current
- 10:3210:32, 23 April 2025 diff hist 0 N File:ZSM(25)000081r1 ZSM PoC 9 Intent-Driven Energy-Saving Final Report.pdf No edit summary current
- 10:1410:14, 23 April 2025 diff hist +24 Ongoing PoCs No edit summary
- 10:0410:04, 23 April 2025 diff hist +322 PoC 9 Intent-driven Energy Saving. No edit summary
20 February 2025
- 09:1109:11, 20 February 2025 diff hist +1,441 N PoC 13 Intent-based RAN resource management Created page with "== PoC Team == * DOCOMO Communications Lab. * NTT Comware Corp. * NTT Communications Corp. * NTT DOCOMO INC. == Main Contact == * Choonming Chen (choonming.chen.nu''_at_''nttdocomo.com) == Abstract == This PoC demonstrates the use case of the Intent-based RAN resource management. The scope of this PoC is to verify how the RAN MD checks the feasibility of RAN intent delivered from E2E MD based on RAN resource usage and reservation status, and sends the result of the inte..."
- 09:1009:10, 20 February 2025 diff hist +157 Ongoing PoCs No edit summary
29 January 2025
- 16:5216:52, 29 January 2025 diff hist +2,148 N PoC 12 Trustworthy Zero-touch Network and Service Management in 6G Networks with XAI and LLMs. Created page with "== PoC Team == * EURECOM * ISI * IQU * OTE * ORO == Main Contact == * Prof. Adlen Ksentini (adlen.ksentini"_at_"eurecom.fr) == Abstract == The proof-of-concept (PoC) will showcase the 6G-Intense project’s Domain Manager and Orchestrator (DMO) solution, which manages hosting services (ZSM002) through a closed-loop control mechanism (ZSM009-1). This mechanism detects and resolves anomalies while providing human-friendly explanations (intent reporting, ZSM011). The PoC f..." current
- 16:4916:49, 29 January 2025 diff hist +152 Ongoing PoCs No edit summary
20 November 2024
- 09:2009:20, 20 November 2024 diff hist +1,872 N PoC 10 Building Cloud AR/VR Service on CAMARA by Using ZSM Framework (Phase Two). Created page with "== PoC Team == * Telefonica * Huawei Technologies * Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) == Main Contact == * Henry YU (henry.yu1''_at_''huawei.com) == Abstract == This PoC is the second phase of the collaborative project on using ZSM framework to build a CAMARA NaaS platform. The first phase of this project has been carried out by ZSM PoC #8, where the architectural framework and basic functionality of a NaaS platform have been implemented, and..." current Tag: Visual edit: Switched
- 09:1609:16, 20 November 2024 diff hist +202 Ongoing PoCs No edit summary
12 November 2024
- 18:2518:25, 12 November 2024 diff hist 0 PoC 9 Intent-driven Energy Saving. No edit summary
- 18:2318:23, 12 November 2024 diff hist 0 PoC 11 Intent-driven Energy Saving integrated with NDT. No edit summary current
- 16:1416:14, 12 November 2024 diff hist +14 PoC 9 Intent-driven Energy Saving. No edit summary
- 16:1016:10, 12 November 2024 diff hist +245 PoC 9 Intent-driven Energy Saving. No edit summary
- 15:4815:48, 12 November 2024 diff hist +2,358 N PoC 11 Intent-driven Energy Saving integrated with NDT. Created page with "== PoC Team == * Deutsche Telekom * Huawei Technologies * China Telecom * Xidian University == Main Contact == * Miss yuan XIE (yuan.xie''_at_''huawei.com) == Abstract == This PoC Project will describe the enhanced intent-driven approach for radio network Energy Saving in the radio network domain by utilizing NDT. The PoC aims to demonstrate: 1) How to express different RAN UE throughput targets for different Frequencies or RATs in the specified area in the same int..."
- 15:4715:47, 12 November 2024 diff hist +20 Ongoing PoCs No edit summary
- 15:3915:39, 12 November 2024 diff hist +136 Ongoing PoCs No edit summary