PoC 3 Automation of Intent-based cloud leased line service: Difference between revisions

From ZSM Wiki
Jump to: navigation, search
Line 32: Line 32:


== PoC Reports ==
== PoC Reports ==
* PoC #3 Final report (January 2023) - [http://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2023/ZSM(23)000026r1_ZSM_POC_3_Final_Report.docx ZSM(23)000026r1] on ETSI portal - [[media:ZSM(23)000026_ZSM_POC_3_Final_Report.pdf |Download pdf]]
* PoC #3 Final report was presented to ZSM#23 on the 9th of May 2023 - [http://docbox.etsi.org/ISG/ZSM/05-CONTRIBUTIONS/2023/ZSM(23)000026r1_ZSM_POC_3_Final_Report.docx ZSM(23)000026r1] on ETSI portal - [[media:ZSM(23)000026_ZSM_POC_3_Final_Report.pdf |Download pdf]]


* '''PoC Successfully Completed'''
* '''PoC Successfully Completed'''

Revision as of 16:55, 9 May 2023

PoC Team

  • China Telecom
  • China Mobile
  • China Unicom
  • Huawei Technologies
  • AsiaInfo Technologies
  • Xidian University

Main Contact

  • Wang Dong, China Telecommunications (wangd5_at_ chinatelecom.cn)
  • Henry Yu, Huawei (henry.yu1_at_huawei.com=

Abstract

This PoC demonstrates the automation of the Intent-based cloud leased line (CLL) use-case. The use-case is developed on ONAP, and its implementation complies with the ZSM standards. The PoC will demonstrate management services (defined in ZSM 002), cross-domain orchestration (ZSM 008), closed-loop (ZSM 009), and Intent-based networking (ZSM 011).


PoC Proposal

The full PoC proposal is available in the ETSI ZSM Portal: ISG ZSM PoC proposal "Intent-based Cloud Leased Line on ONAP" - Download pdf

PoC Topics

This PoC is WORKING on:

PoC Demo

  • Demo 1, May 2022, "Automated CPL service creation and modification using ZSM framework (ZSM 002) (simulated hardware)"
  • Demo 2, Dec 2022, "Closed-loop in Transport MD (ZSM 009) (simulated hardware). Demo 2 will be built as an evolution of Demo 1."

PoC demos were given at ZSM#19 (video of the demo is available here) and ZSM#21 meetings.

Other links

PoC Reports

  • PoC Successfully Completed